Breakfast Point Subdivision Phase 3B

BREAKFAST POINT SUBDIVISION PHASE 3B

Project Description

Contract Name:   Breakfast Point Subdivision Phase 3B
Location:   Panama City Beach, FL

Scope of Work

69 Lot Subdivision for St Joe Company. Work performed includes Clearing, grading, storm drain, water, sewer, conduit, subgrade, base, asphalt paving, curb and gutter, sidewalk, striping, signs, and grassing.

Eglin Military Family Housing

EGLIN MILITARY FAMILY HOUSING

Project Description

Contract Name:   Eglin Military Family Housing
Location:   Eglin AFB, FL

Highlights

Project was phased into 7 different phases to provide a staged release of home sites.

Scope of Work

The 150 acre site was selected by Eglin AFB to be the new base housing site consisting of 421 home sites. The scope of work included clearing, grading, sewer, water, storm drainage, subgrade, base, paving, curb and gutter, striping, and grassing.


SR 20 Washington Co

SR 20 WASHINGTON CO


Project Description

Contract Name:   SR 20 Washington Co
Location:   Ebro, FL

Highlights

We achieved an average ride number of 4.5

Scope of Work

This section of SR 20 in Washington Co, FL was 4.7 miles long. It consisted of milling the existing travel lanes 2″ deep and the shoulders 1/2″ deep. A 1.5″ Superpave 12.5″ MM asphalt mix with Polymer Modified Asphalt PG 76-22 was placed and then a 1″ Friction Course of FC 9.5 asphalt mix with Polymer Modified Asphalt PG 76-22. Guardrail was replaced along with highway signage and striping.


Sheltair Parking Apron Expansion

SHELTAIR PARKING APRON EXPANSION


Project Description

Contract Name:   Sheltair Parking Apron Expansion
Location:   Panama City Beach, FL

Highlights

This was the first time we produced and laid fuel resistant asphalt.

Scope of Work

Sheltair expanded their facility at Northwest Florida Beaches International Airport in 2016. The project consisted of excavation, storm drainage, subgrade, base course, and P401 asphalt pavement.


Destin Airport Runway Reconstruction

DESTIN AIRPORT RUNWAY RECONSTRUCTION


Project Description

Contract Name:   Destin Airport Runway Reconstruction
Location:   Destin, FL

Highlights

The project required all work on the runway to be done during a 7 day shutdown period. We were able to complete the project in 10 days after 3 days of rain delayed the scheduled opening. 3D paving was performed by using 6 total stations and 2 paving crews placing asphalt in tandem to prevent cold longitudinal joints.

Scope of Work

This runway was milled and resurfaced to a new profile to correct slopes. New runway lighting system was installed as well as shoulder regrading and sodding.

Design Build Santa Rosa Island Range Road

DESIGN BUILD SANTA ROSA ISLAND RANGE ROAD


Project Description

Contract Name:   Design Build Santa Rosa Island Range Road
Location:   Eglin AFB, FL

Highlights

The site access road is the only route for automobile traffic on the Island so 2-directional traffic had to be maintained at all times. Furthermore, aside from significant wetland systems within the project area, (both isolated freshwater wetlands and tidally influenced estuarine wetlands) numerous Federally listed, State listed and Florida Natural Areas Inventory (FNAI)-tracked floral and faunal species occur on or utilize the island. There were also several cultural resource areas within the project limits that could not be disturbed. All of these issues required the team to develop a comprehensive plan to construct the project without causing detriment to the environmental characteristics of the island while maintaining access to the fully operational test facility. CWR DB Team saved the owner over 1.5 million in Cost Saving Initiatives.

Scope of Work

The ACOE and Eglin Air Force Base (AFB) proposed to rebuild and reinforce the Santa Rosa Island Range Complex Road, including facility access roads, totaling 15.6 miles on Santa Rosa Island (SRI), Eglin AFB. The purpose of this 42.2 million dollar project was to provide a facility that would maintain uninterrupted access to 13-Test Areas (TAs) located on Santa Rosa Island, which are vital to the United States’ national defense network. The design incorporated an armoring system, consisting of sheet piles walls, on one or both sides of the main road along 4.6 miles to prevent road destruction and displacement resulting from tropical storm-generated storm surge. The remaining 8.5 miles of the main road, in discontinuous sections, incorporated a typical roadway design without sheet piles as these portions of the road are protected from erosion damage by the natural dune system. In its previous condition, the road presented a significant safety hazard and impediment to military operations.


Repair Airfield Pavements – King Hanger

REPAIR AIRFIELD PAVEMENTS - KING HANGER


Project Description

Contract Name:   Repair Airfield Pavements – King Hanger
Location:   Eglin AFB, FL

Highlights

Work was completed adjacent to an active taxiway.

Scope of Work

Complete removal of airfield pavement and replacement near King Hanger at Eglin AFB. Removed existing asphalt and base, then excavated to new subgrade elevation. Installed 16″ of graded aggregate base and 8″ of airfield asphalt.


Repair Taxiway M

REPAIR TAXIWAY M


Project Description

Contract Name:   Repair Taxiway M
Location:   Eglin AFB, FL

Scope of Work

Demolition of existing concrete paving, existing base, and existing subgrade. Subgrade was prepared to accomadte the new 16″ of graded aggregate base and 14″ of 750 flex concrete pavement.


Duke Field Runway 18-36

DUKE FIELD RUNWAY 18-36


Project Description

Contract Name:   Duke Field Runway 18-36
Location:   Eglin AFB, FL

Scope of Work

Mill and Resurface Runway 18-36 at Duke Field on Eglin AFB, FL. The 8000 foot runway was milled 4″ deep and then resurfaced with 4″ of airfield asphalt. New airfield markings were then installed on the new asphalt surface.


Watercolor PH IV – Publix

WATER COLOR PH IV - PUBLIX


Project Description

Contract Name:   Water Color PH IV – Publix
Location:   Watercolor, FL

Scope of Work

The 13 acre site consisted of clearing, grading, water, sewer, storm drainage, curb and gutter, subgrade, base, asphalt paving, brick pavers, lighting, landscaping, and striping. A new traffic signal was also installed along with other roadway improvements.