SR 20 WASHINGTON CO
Project Description
Contract Name: SR 20 Washington Co
Location: Ebro, FL
Highlights
Scope of Work
This section of SR 20 in Washington Co, FL was 4.7 miles long. It consisted of milling the existing travel lanes 2″ deep and the shoulders 1/2″ deep. A 1.5″ Superpave 12.5″ MM asphalt mix with Polymer Modified Asphalt PG 76-22 was placed and then a 1″ Friction Course of FC 9.5 asphalt mix with Polymer Modified Asphalt PG 76-22. Guardrail was replaced along with highway signage and striping.